Evaluating Nature-Based and Engineered Solutions on Sugarloaf Island?s Shoreline Dynamics with sUAS and SfM (2023-2025) Grant uri icon

abstract

  • To provide topographic mapping for monitoring restoration on Sugarloaf Island

date/time interval

  • August 2024 - December 2025