Kinston Bypass Project Grant uri icon

abstract

  • This project is a subcontract to URS, the engineering firm which has been engaged by NCDOT to provide an Economic Impact Assessment for the proposed Kinston Bypass of US70.

date/time interval

  • September 2013 - September 2015