Evaluation of the Pollutant Treatment Efficiency of an Innovative Stormwater Control Measure Grant uri icon

abstract

  • East Carolina University will sample the innovative stormwater wetland during 18 separate storm flow events over a 3 year period. Composite samples will be collected at the inlet and outlet of the wetland using automated samplers. We anticipate sampling 5-6 times prior to the construction of the wetland to provide baseline, pre-best management practice data and 12-13 times post implementation.

date/time interval

  • January 2018 - June 2020